Clifton Estate

Clifton Estate

Client: Southwark Council Main Contractor: A & E Elkins Contract Value: £52k Works description: Install frame armour systems to 66 front entrance doors and replace the leafs of these doors across 3 residential blocks. Summary of works: Supplying and installing our own in-house designed steel frame armour section which fits over existing door frames, we… Continue Reading

Crofton Infant and Junior Schools

Crofton Infant and Junior Schools

Client: Ridge & Partners LLP Main Contractor: London Fire Solutions Contract Value: £315k + Works description: A time critical project; the renewal of fire doors to FD30 door set installs and overhead glazing replacements across two schools. Summary of works: Fire stopping across escape routes in Crofton Junior School Replacement of over 125 single and… Continue Reading

Pimlico Estate

Pimlico Estate

Client: Peabody Housing Association Main Contractor: Axis Europe PLC Contract value: £460k + Works description: The removal and installation of new fire doors including front entrance doors and communal riser doors across 21 residential blocks.  Summary of works: Remove and dispose of 224 front entrance doors and install new, certified fire doors. The manufacture of front doors as per… Continue Reading

Walworth Estate

Walworth Estate

Client: Peabody Housing Association Main Contractor: Axis Europe PLC Contract Value: £190k + Works description: New front entrance door sets, communal risers and loft hatches were installed across 10 Victorian mansion blocks   Summary of works: Installing FD30 front entrance door sets with the necessary fire stopping to any wires penetrating the door set. Install… Continue Reading

Dickens Estate

Dickens Estate

Client: Southwark Council Main Contractor: Standage & Co. Ltd Contract Value: £532k Works description: Compartmentalising the 12 residential blocks by carrying out fire stopping works, manufacturing and installing the intake cupboards and internal front entrance doors. Summary of works: Manufacturing and renewing over 400 FD30 front entrance doors; some requiring fire rating glazing. Carrying out… Continue Reading

Newington Estate

Newington Estate

Client: Southwark Council Main Contractor: Axis Europe Works description: Working across 5 buildings; sheltered and residential. Installing over 230 new front entrance door sets and 26 communal door sets. Summary of works: Install FD30 front entrance door sets with the necessary for stopping works to any cable penetrations that may be going through the door… Continue Reading

Tower Hamlets Schools

Tower Hamlets Schools

Main Contractor: G4S Contract Value: £40k + Works description: Carrying out comprehensive surveys to over 25 schools across the Tower Hamlets area. Summary of works: Produce a full report in hard and soft copy of over 25 schools during the school holidays with a full breakdown of the compartmentation work needed in each building; which… Continue Reading

Irwell Estate

Irwell Estate

  Client: Southwark Council Main Contractor: Standage & Co. Ltd Contract Value: £23k Works description: Upgrading of 65+ front entrance doors to be fire rated. Although these doors were solid core, high quality security entrance doors they were not fire rated. To avoid complete renewal of these doors which would have cost the client in… Continue Reading

St. Georges Wharf

St. Georges Wharf

  Client: Berkeley Group Main Contractor: Homepride Building Services Contract Value: £7k + Works description: Compartmentation works to the restaurant area of the building. Summary of works: Fire stopping works to various penetrations. Installing unicollars around soil vent pipes (SVPs)     Continue Reading

Chichester Foyer

Chichester Foyer

  Client: Home Group Main Contractor:  London Fire Solutions LLP Contract Value: £55k Works description: Carrying out upgrade and renewal work to communal doors and internal front entrance doors to the bedrooms of a housing association building for single homeless people ages 16-25. Summary of works: Upgrading and renew glazed and flush communal cross corridor… Continue Reading

Blue Finn Building

Blue Finn Building

Client: Broadgate Estates Contract Value: £6k + Works description: To carry out a survey for compartmentalisation works needed in the £415 million, 16 level floor-to-ceiling glazed building. Summary of works: Conduct a detailed, comprehensive fire stopping survey. This survey included a marked out floor plan of all the areas of where fire stopping work was… Continue Reading

Brandon Estate

Brandon Estate

Client: London Borough of Southwark Main Contractor: J. Murphy & Son Contract value: £1.5 million Works description: The contract was split into 2 packages covering over 30 tower blocks across the Borough and Bankside area of Southwark. To carry out a detailed survey of over 2,000 existing fire doors. We undertook this work through the BM Trada accreditation, which is reviewed annually.… Continue Reading

Marine Tower

Marine Tower

        Client: Lewisham Homes Main Contractor: Standage & Co Contract value: £50k Works description: Following an arson attack in February 2011 where sadly 2 residents lost their lives, London Fire Solutions were appointed to carry out passive fire protection works on the building. Summary of works: Remove and replace 64 front entrance doors Provide fire… Continue Reading

Peabody Avenue

Peabody Avenue

Project Name: Peabody Avenue, Pimlico, SW1V Client: Peabody Housing Association Main Contractor: Axis Europe PLC Contract value: in excess £460k Works description: Spread across 21 blocks, to remove and install new fire doors, mixed between front entrance doors and communal riser doors. Summary of works: Remove and dispose of 224 front entrance doors and install new,… Continue Reading

Bank of England

Bank of England

Project Name: Bank of England, Threadneedle Street EC2R Client: Bank of England Contract value: in excess of £10k Works description: Following on from successful works at the Moorgate building we were invited to survey the entire building’s doors and fire stopping to determine which corridors and rooms need their doors upgrading and/or replacing. This contract includes… Continue Reading

Pembury Estate

Pembury Estate

Project Name: Pembury Estate, Hackney E5 Client: Peabody Housing Association Main Contractor: Axis Europe PLC Contract value: £150k Works description: Spread across 26 blocks, to compartmentalise and install fire protection in the void loft areas of the 1930s buildings. Summary of works: Install 127 Firefly Phoenix curtains, offering fire protection against the passage of fire and smoke.… Continue Reading

Please see brief work descriptions of varying works we have completed in a variety of industries and buildings. To see more clients that we have worked with please click here.


Print Friendly

Project Name: Pembury Estate, Hackney E5
Client: Peabody Housing Association
Main Contractor: Axis Europe PLC
Contract value: £150k
Works description: Spread across 26 blocks, to compartmentise and install fire protection in the void loft areas of the 1930s buildings.

Summary of works:

  • Install 127 Firefly Phoenix curtains, offering fire protection against the passage of fire and smoke.
  • Install 176 fire rated access panels in to the Firefly Phoenix curtains to allow access through the void areas.
  • Use Firetherm Intubatt and Intumastic to seal penetrations made from cables, pipes and cable trays.
  • Install Promat Unicollar around pipes to maintain the integrity of the fire resistant elements through which various plastic pipes pass.

Following the successful work at Pembury Estate, Steve Jennings, Divisional Manager, Axis Europe PLC said:

“LFS are installing fire doorsets on behalf of Axis for London Borough of Southwark and due to high performance levels were selected to provide services for Fire Upgrade Works including fire doors and fire stopping for Peabody. Reports are clear and concise and have been drafted in a timely fashion by staff knowledgeable in their field providing assurance that works will be of a good standard and certified to evidence third party accreditation.” see more testimonials here

pembury07w  20160111_133425    1st - Heating Control North of 17A.3


Print Friendly

Project Name: Bank of England, Threadneedle Street EC2R
Client: Bank of England
Contract value: in excess of £10k
Works description: Survey the entire building’s doors and fire stopping to determine which corridors and rooms need their doors upgrading and/or replacing. This contract includes a heavy vetting process to allow access in to the building.
Summary of works:

  • Carry out a comprehensive survey in excess of 835 doors; mixed between communal, office, various riser and vault area doors. These doors include specialist heritage doors and security doors.
  • Carry out a survey of all fire stopping works needed in all riser areas of the building.

Following the successful work at The Bank of England, Mark Bentley, the Building Services Technician said:

“insert testimonial here” see more testimonials here

OLYMPUS DIGITAL CAMERA

bank of england

 

 

 

 

 

 


Project Name: Peabody Avenue, Pimlico, SW1V
Client: Peabody Housing Association
Main Contractor: Axis Europe PLC
Contract value: in excess £460k
Works description: Spread across 21 blocks, to remove and install new fire doors, mixed between front entrance doors and communal riser doors.

Summary of works:

  • Remove and dispose of 224 front entrance doors and install new, certified fire doors.
  • To manufacture the front doors as per residents choice of style and colour.
  • To replace the fanlight above all storey height doors with the residents choice of either a solid or glazed fanlight.
  • Keep up with the demand of appointments booked by LFS and Axis Europe of up to 10 door installs per day.
  • Remove 20 communal riser doors and replace with new, certified fire doors in a uniform Peabody colour and locking system.

Pimlico side     Flat 7 Peabody Estate     10A     Pimlico Riser door


Project Name: Marine Tower
Client:
 Lewisham Homes
Main Contractor: Standage & Co
Contract value: £50k
Works description: Following an arson attack in February 2011 where sadly 2 residents lost their lives, London Fire Solutions were appointed to carry out passive fire protection works on the building.

Summary of works:

  • Remove and replace 64 front entrance doors
  • Provide fire stopping to the electrical risers.
  • A time-critical job for Lewisham Homes, LFS completed the manufacture and installation and sign off (FIRAS & Q-Mark) of all front entrance doors within 6 weeks.

Many residents commented that the improved security and fire integrity made them feel safer.


Project Name: Borough and Bankside
Client: London Borough of Southwark
Main Contractor: J. Murphy & Son
Contract value: £1.5 million
Works description: The contract was split into 2 packages covering over 30 tower blocks across the Borough and Bankside area of Southwark.

  • To carry out a detailed survey of over 2,000 existing fire doors. We undertook this work through the BM Trada accreditation, which is reviewed annually.
  • Manufacture and install approximately 2000 fire doors in 5 months to meet an extremely demanding construction programme.
  • All doors were manufactured and installed under BM Trada’s Q-Mark scheme which provides chain of custody compliance processes providing the client with complete peace of mind.

Following the successful delivery of this project, Bryan McNamee, Murphy’s Contracts Manager said:

“London Fire Solutions proved to be an able sub-contractor who, despite the intensity of the programme, performed well, producing quality doors and installations. They demonstrated a proactive approach to any difficulties on the project and integrated well within our team.” see more testimonials here